Afterburner for ATM moved into place

Last summer Hollandia Systems built this afterburner for ATM Moerdijk. The 45 meter high construction contains over 200 tons of steel and weighs no less than 1.2 million kg! ATM assembled the afterburner on site. Heijmans moved this giant into place and made following timelapse.

Date: